Swastik Digital · Factory Optimization

2026-09-18 12:00 → 2026-09-19 ~12:00 IST (1-day delta since run 1).
Run 2026-09-19 · September 2026 scope 256 production rows · 42 flagged 3,814 messages analyzed (window) auto-generated from analytics.db + structured CSVs
4
Findings 2×P1 2×P2
3,814
WhatsApp msgs (window)
11/19
Machines with any output
42
Report rows flagged
2,128
Digital inward total (taka)
26
Defect mentions (window)

Digital grey inward

2026-0928601480203245040550065407220081760916210175111213377141371523161717518Digital inward, taka/day (≈100 mtr each) · empty slot = no sheet

Empty slot = sheet not posted/received (OPT-001). 09-04 recovered via backfill — sheet exists despite FOSTTA holiday. Click to expand.

Watch list (active now)

  • 09-19 "Chalu nhi ho rha" PC (unidentified) — fix reply pending; check next run.
  • Ductable coil replacements (2/3) + Ricoh compressor arrival — dates pending.
  • Mc1 09-18 stop: no further status found in window; presumed resolved or superseded — confirm closed.
  • 09-18/09-19 production reports not yet posted at data end (intraday-normal).
Remark · per management (09-18), motherboard failures are in practice power-related; IT states them without cause ("Motherboard problem", "power line repaired"). Power-quality hypothesis leans true — pending voltage-logging before any stabilizer purchase.

Priority findings

P1 OPT-003HVAC — pre-planning + spares policy delivered 09-19 (5 days late); installs pendingOPEN

HVAC chronic: cooling failures → colour cut + machine stops; 09-19 pre-planning+spares policy delivered (2/3 ductable coils to replace, warranty-only compressors), design-room split Done 09-18; installs (coils/compressor) pending, response SLA unmeasured

Evidence
09-18 chase listed 4 demands (paper-print coil "very very very important", design-room split, Ricoh compressor, written preplanning). Same day: "Split A.C Design room Done running ok". 09-19 02:56 pre-planning text: 3 unit kinds (Carrier ductable / Mitsubishi+OGeneral split / OGeneral window); 2 of 3 ductable coils to be replaced; one spare condenser coil + one coil set each for Mitsubishi/OGeneral/window; compressors warranty-only; PCB/remote 2-day repair, no stock. So the EOD-09-14 schedule demand is now answered in writing; coil/compressor installation dates still unrecorded. Single-source (AC group text).
Loss Type
Availability + Quality chain (unchanged)
Priority
P1 (unchanged)
Longevity
chronic (unchanged)
Fix Class
structural (unchanged)
Owner
management (Aditya Khemka) + HVAC vendor
Next Check
coil + compressor installation dates posted; median complaint→onsite <24h; zero heat-attributable "colour cut"/"m/c band".
P1 OPT-004IT/PC — one same-day close (hang→Done 09-18); one new open ("Chalu nhi ho rha" 09-19); photos carry no serialsOPEN

IT/PC recurring hardware failures (UPS ×2 in 4 days, motherboard repeat failure); IT task open >1 month until escalation. Owner update 09-18: motherboard failures are power-related per IT's own reports ("power line repaired" phrasing) → power-quality protection (logging → SPD/servo + online UPS + earthing check) now part of this finding's fix path

Evidence
09-18 "Maru pc hang" → "Done" within ~15 min (close-out worked once). 09-17 paper-print m/c-1 monitor fault closed via "VGA slot not working, new HDMI connected, now working fine". New: 09-19 "Chalu nhi ho rha h" + photo, no fix reply by data end. 5 new device photos (09-18/09-19, both PC groups) show blank/black monitors + towers, HP/AOC/Logitech marks only — no serial, model label, or PC number legible, so **zero `pcsystem.db` inserts** (nothing to extract; text issues already covered by existing event pipeline, latest event 09-19 10:37). Single-source.
Loss Type
Availability (+ data) (unchanged)
Priority
P1 (unchanged)
Longevity
chronic (unchanged)
Fix Class
structural + habit layer (as run 1); add: sender must caption photos with PC number.
Owner
IT (Rehan + vendor)
Next Check
≤1 new complaint/week; UPS battery list with dates; IT report without chasing 2 weeks; photos captioned with PC number.

Machine utilization (window)

Folding m/c's18,187 mtr/day56% daysZero- Zero m/c prod12,334 mtr/day100% daysStenter m/c -611,000 mtr/day12% daysHybrid Ptg m/c6,787 mtr/day94% daysPaper Ptg m/c5,910 mtr/day81% daysFuzing m/c 14,817 mtr/day31% daysFuzing m/c 34,078 mtr/day88% daysM/C no 23,271 mtr/day88% daysFuzing m/c 22,462 mtr/day12% daysHomer Ptg m/c2,236 mtr/day94% daysRicho Ptg m/c1,919 mtr/day88% daysFolding dispatch0 mtr/day0% daysArif(k.man)0 mtr/day0% daysWhinch m/c0 mtr/day0% daysStenter m/c 50 mtr/day0% daysStenter m/c 70 mtr/day0% daysRam singh(k.man)0 mtr/day0% daysFoldingdispatch0 mtr/day0% daysFolding disp0 mtr/day0% days

Bar = avg mtr/day on running days. Green ≥80% days active · amber ≥30% · red <30%. Click the chart to expand.

Findings

P1 OPT-003HVAC — pre-planning + spares policy delivered 09-19 (5 days late); installs pendingOPEN

HVAC chronic: cooling failures → colour cut + machine stops; 09-19 pre-planning+spares policy delivered (2/3 ductable coils to replace, warranty-only compressors), design-room split Done 09-18; installs (coils/compressor) pending, response SLA unmeasured

Evidence
09-18 chase listed 4 demands (paper-print coil "very very very important", design-room split, Ricoh compressor, written preplanning). Same day: "Split A.C Design room Done running ok". 09-19 02:56 pre-planning text: 3 unit kinds (Carrier ductable / Mitsubishi+OGeneral split / OGeneral window); 2 of 3 ductable coils to be replaced; one spare condenser coil + one coil set each for Mitsubishi/OGeneral/window; compressors warranty-only; PCB/remote 2-day repair, no stock. So the EOD-09-14 schedule demand is now answered in writing; coil/compressor installation dates still unrecorded. Single-source (AC group text).
Loss Type
Availability + Quality chain (unchanged)
Priority
P1 (unchanged)
Longevity
chronic (unchanged)
Fix Class
structural (unchanged)
Owner
management (Aditya Khemka) + HVAC vendor
Next Check
coil + compressor installation dates posted; median complaint→onsite <24h; zero heat-attributable "colour cut"/"m/c band".

Findings

P1 OPT-004IT/PC — one same-day close (hang→Done 09-18); one new open ("Chalu nhi ho rha" 09-19); photos carry no serialsOPEN

IT/PC recurring hardware failures (UPS ×2 in 4 days, motherboard repeat failure); IT task open >1 month until escalation. Owner update 09-18: motherboard failures are power-related per IT's own reports ("power line repaired" phrasing) → power-quality protection (logging → SPD/servo + online UPS + earthing check) now part of this finding's fix path

Evidence
09-18 "Maru pc hang" → "Done" within ~15 min (close-out worked once). 09-17 paper-print m/c-1 monitor fault closed via "VGA slot not working, new HDMI connected, now working fine". New: 09-19 "Chalu nhi ho rha h" + photo, no fix reply by data end. 5 new device photos (09-18/09-19, both PC groups) show blank/black monitors + towers, HP/AOC/Logitech marks only — no serial, model label, or PC number legible, so **zero `pcsystem.db` inserts** (nothing to extract; text issues already covered by existing event pipeline, latest event 09-19 10:37). Single-source.
Loss Type
Availability (+ data) (unchanged)
Priority
P1 (unchanged)
Longevity
chronic (unchanged)
Fix Class
structural + habit layer (as run 1); add: sender must caption photos with PC number.
Owner
IT (Rehan + vendor)
Next Check
≤1 new complaint/week; UPS battery list with dates; IT report without chasing 2 weeks; photos captioned with PC number.

Insights & suggestions

What the data shows

  • UPS failures on 3 different PCs in 4 days (8/29, 9/14, 9/17) — one needed a battery change
  • Repeat motherboard deaths (8/31 paper-print MC1, 9/7) — one back after 4–5 months with the same fault; management assesses power-related (IT states no cause)
  • Procurement confirms the chain: 3 SMPS ordered 09-01 for poly-print PCs; motherboard chase same day; 09-17 RTC-section board repair quoted ₹1800+GST
  • AC electrical signals: office-AC sparking (9/12), design-room compressor dead (9/16), Ricoh compressor undelivered, m/c stopped from heat (9/5)
  • Cuts themselves are routine — the damage is what dies after them
PC fleet (IT register, Google Sheet 09-09)

44 PCs across 4 sections (+23 design-dev PCs in the 08-28 xlsx) · CPU generation mix:

≤2013 (gen ≤4)5
2015–18 (gen 5–8)12
2019–21 (gen 9–11)14
2022+ (gen 12+)10
other/unknown3

Pre-2019 machines = 17 of 44 — aging boards + budget PSUs (ARTIS/ANT/EVM) tolerate dirty power badly. Register has no UPS column — add one, log PSU swaps per PC.

Power-quality decision plan (before buying anything)
1
Log the voltage — ₹0–8k, 2 weeks. Logger on main incoming + PC circuit; readings 9am / 2pm / 7pm / 11pm. Verdict: sustained 400V ±10% violation or deep sags → stabilizer justified; steady → skip it.
2
Failure forensics — ₹0. Compressor: burnt winding = electrical, dead capacitor = aging. UPS: swollen batteries = heat/age, fried SMPS = spike. Boards: dust + heat = thermal. PSU rail test (₹500 tester) on every failed PC before it leaves the bench.
3
Earth test — ₹2–5k. Bad earthing is the #1 hidden killer near stenter VFDs.
If the log shows…Then buyIndicative cost
Unstable voltage (sag/swell)Servo stabilizer — 150 kVA whole-plant, or 2×75–100 kVA segmented + 15–20 kVA PC room (segmented preferred; copper windings, ±1%, bypass panel)₹2.1–3.1 L · ₹2.8–4.2 L
Stable voltage, spikes after cutsSPD surge protection at main panel only₹15–40k
PSU rails out of spec on failed PCsBulk PSU replacement policy: board dies → PSU replaced same ticket (priority: Vishl RTX3060, PRINTER PC, DIGI1/ABC23, JAGRUTI)₹2.5–4.5k / PC
UPS = dead batteries, boards = dust/heatBulk battery replacement + PC-room cooling + cleaning< ₹25k
Bad earthEarth pits + bonding₹10–20k

Payback: last 30 days — 2 dead compressors, 3 UPS failures, repeat motherboard, 3 SMPS ordered (09-01), RTC-section board repair quoted (09-17). Preventing 2 failures/year covers the package in <12 months.

Message trail30 msgs
stutibnyadav@gmail.comAC maintenance2026-09-04 16:08
paper ka ductable ac cooling nahi ho raha hai, @187342262390793
?AC maintenancevoice2026-09-04 16:08
(media attachment)
stutibnyadav@gmail.comAC maintenancevoice2026-09-04 16:08
(media attachment)
stutibnyadav@gmail.comAC maintenance2026-09-04 17:01
paper printing ka 1 ductable ac leakage ho gaya. plz iska solution kal ke date me karwa dijiye. @187342262390793
stutibnyadav@gmail.comAC maintenance2026-09-05 12:23
Joshi ji abhi tak aapka koi technical person aaya nahi, paper me cooling nahi mil raha hai, colour cut ho raha hai, urgent karwa dijiye.
stutibnyadav@gmail.comAC maintenance2026-09-05 13:21
Joshi ji ac ke liye kisi ko bhejiye, temperature hi ho gaya hai, m/c band ja rahi hai
?AC maintenancevideo2026-09-06 12:00
(media attachment)
stutibnyadav@gmail.comAC maintenancevideo2026-09-06 12:00
(media attachment)
stutibnyadav@gmail.comAC maintenance2026-09-06 12:03
Paper print ka ek ductable ac hai jo Joshi ji ke engineer bata rahe hai ki iska coil kharab ho gaya hai, isko chalu karne per cooling nahi ho raha hai
stutibnyadav@gmail.comAC maintenance2026-09-07 11:03
Design room ka 1 spilit ac se cooling nahi aa raha hai. @187342262390793
😍pc problems2026-09-07 12:35
Motherboard problem
?AC maintenance2026-09-09 14:59
Paper ac 10 no m/c ke pass spilit ac ka cooling nahi aa raha hai, isko sahi karwaiye @15672402817245
stutibnyadav@gmail.comAC maintenance2026-09-09 14:59
Paper ac 10 no m/c ke pass spilit ac ka cooling nahi aa raha hai, isko sahi karwaiye @15672402817245
?AC maintenance2026-09-10 13:47
Paper me cooling ka problem hai, ac cheak karwaiye @15672402817245
?AC maintenancevoice2026-09-10 17:54
(media attachment)
?AC maintenancevoice2026-09-10 17:54
(media attachment)
?AC maintenance2026-09-11 18:26
सर जी डक्टेबल का coil मेजॉरमेंट के लिए आदमी आज भी नहीं आया है @187342262390793
?AC maintenance2026-09-12 09:56
Main office ke ac me sparking hua hai @15672402817245
?AC maintenance2026-09-12 09:57
Dobara chalu karne per cooling nahi aa raha hai
?pc problems2026-09-14 11:22
Ye ups kam nhi kar rha hai ligt jate hai pc band ho ja rha hai @239491738558698 @210149109166242
?AC maintenance2026-09-14 15:15
@187342262390793 waiting for your coil update after 5min .
?pc problems2026-09-15 11:03
Battery chenge
?AC maintenance2026-09-15 12:11
8.5 tan ductable ac cooling coil-2 pcs all ready, your's order please get this also done urgently. @187342262390793
?AC maintenance2026-09-16 14:00
OG 2tr Split A.C Design room apka admi bol raha hai compressor fail hai uska kaise karenge
?AC maintenance2026-09-16 14:02
Warrenty Mai hai to clam kar denge ho jaya ga
?AC maintenance2026-09-16 14:03
Sir Ricoh printing ka bhi compressor abhi tak nahi aya
?pc problems2026-09-17 12:33
Ups nhi chal rha hai 7 number pc ka
?pc problems2026-09-17 12:34
Backup nhi dera bilkul bhi
?AC maintenance2026-09-18 12:43
@187342262390793 need updates in regards to 1.paper print ac coil(very very very important) 2.split ac design room 3.ricoh compressor (if not done yet) 4.havent recieved an update about the preplanning about maintanence and spare parts (you were supposed to share a written doc for the same)
?AC maintenance2026-09-19 08:26
Pre planning We have 3 kind of units in digital 1) Carrier Ductable 2) Mitsubishi and OGeneral split 3) OGeneral window 2 coils out of 3 Ductable will be replaced We need to have one condenser coil in spare One coil set each for Mitsubishi and OGeneral and same for window ac We cannot have compressor as it comes with warranty All other parts like PCB or remote will be repaired in two days so we don't need to stock
Open doubt on ACs: these may be dust-choked coils / missing PM rather than voltage — coil forensics (capacitor vs burnt winding) must decide before blaming the supply.

Defect mentions by type (window)

foil5cudi (fold/crease)4palti (design shift)4dagi / stain4dasa3heading3colour / light-dark2chati1

Keyword mentions across dagi + main groups. Parties hit most: Diwan ×3; Meesha, Mukesh, Saha, Kamal, Golobel ×2 each. Split across two groups = no single defect ledger (OPT-006). Click to expand.

White / finish lots

2026-091170111 lots2370210 lots1720310 lots176044 lots170053 lots95063 lots79076 lots950810 lots800910 lots146105 lots151118 lots98125 lots154134 lots83145 lots641510 lots1561613 lots80176 lots113186 lotsWhite / finish lots — taka/day (≈100 mtr each) · 129 lots total

Total 2,266 taka (≈ 227 k mtr) across 129 lots, 08-28 → 09-06. Shortage complaints map here (OPT-009). Click to expand.

Findings

P2 OPT-006Defect stream — 2 new reports + 09-18 folding dugi on 4 lots; still zero closuresOPEN

Defect stream has no closure loop; whole-lot defects (Sep 10, Sep 15) with no disposition or mtr recorded

Evidence
09-18 dagi group "sunrise orgenja 44pana, 5–6 tako me yesa" (+2 photos); 09-19 main group "Korean checks fabric me heading out hai". White 09-18 folding report (p74 batch): SLS 2242 (5 dugi pieces), 2243 (12), 2244 (7), 2307-DB (5) — dugi-heavy batch across all 4 SLS/DB lots. No "fixed/closed" reply in any thread. Single-source.
Loss Type
Quality + data (unchanged)
Priority
P2 (unchanged)
Longevity
systemic (unchanged)
Fix Class
habit-dependent (unchanged)
Owner
QC/printing leads (Divyesh Patel, vinaymishra9)
Next Check
≥80% reports with closure reply + mtr affected; weekly rework meters.

Findings

P2 OPT-011Design loop — Zari/44-pana rounds 09-18 eveningOPEN

Design color-correction loop: 3+ rounds per design, chased till 11pm; files mostly unnamed

Evidence (Hybrid Design Group)
09-18 17:18 nine design images + "Zari"; 20:29–20:32 "left to right 44" ×3 + "narrow and finest possible… ensure enough Zari". Same spec vocabulary as run 1, late-evening chasing pattern repeated. Thin data (1 evening), single-source.
Loss Type
Performance (unchanged)
Priority
P2 (unchanged)
Longevity
chronic, provisional (unchanged)
Fix Class
habit-dependent (unchanged)
Owner
design lead + client coordinator
Next Check
correction rounds/design (baseline ~3); % standard filenames.

What would move the needle

  • Pickup aging log (posted → picked, escalate >48h) — kills the "8 din se challan" class of problems (OPT-012)
  • Color spec sheet per client (whiteness %, brightness reference) — cuts the 3-round correction loop (OPT-011)
  • Lot closure rule: taka expected vs received before "complete" — settles shortages same day (OPT-009)
  • Stop reason + restart time for every loop/stenter pause — already emerging via Altaf's posts; make it the norm (OPT-010)

Open-issues ledger (cross-run, all IDs)

IDFirst seenPriorityStatusSummary
OPT-0012026-09-18 P2 PARTIAL Grey-inward stall — Digital scope 09-07→09-18 known (09-18 Digital 175 added 09-19; manifest seeded). Remainder: 09-12/09-13 never posted; 09-17 Digital −40 human verify; structural risk (manual lag + failed downloads hidden) open
OPT-0022026-09-18 P1 OPEN Production report loop: byte-identical repost (Sep 15→16 hole in day attribution, Homer base −3,018) + ~1 arithmetic slip per 4 days
OPT-0032026-09-18 P1 OPEN HVAC chronic: cooling failures → colour cut + machine stops; 09-19 pre-planning+spares policy delivered (2/3 ductable coils to replace, warranty-only compressors), design-room split Done 09-18; installs (coils/compressor) pending, response SLA unmeasured
OPT-0042026-09-18 P1 OPEN IT/PC recurring hardware failures (UPS ×2 in 4 days, motherboard repeat failure); IT task open >1 month until escalation. Owner update 09-18: motherboard failures are power-related per IT's own reports ("power line repaired" phrasing) → power-quality protection (logging → SPD/servo + online UPS + earthing check) now part of this finding's fix path
OPT-0052026-09-18 P2 OPEN Zero-run machines (Stenter 7/−6, Whinch M/C no 1, Fuzing 2) — idle vs unallocated unconfirmed
OPT-0062026-09-18 P2 OPEN Defect stream has no closure loop; whole-lot defects (Sep 10, Sep 15) with no disposition or mtr recorded
OPT-0072026-09-18 P2 OPEN Machine-name churn fragments series (Folding dispatch ×3 names; Ritesh (k.man) missing from CSV)
OPT-0082026-09-18 P1 OPEN IT procurement confirms PSU/board power chain: 3 SMPS ordered 09-01, motherboard chase, 09-17 RTC-section repair quote; 15/23 Digital PCs on budget PSUs
OPT-0092026-09-18 P1 OPEN White/finish lot shortages: 7 "taka kam" events in 3 weeks ≈ 700–1,000+ mtr unaccounted (1 taka ≈ 100 mtr), no reconciliation loop
OPT-0102026-09-18 P2 OPEN Processing stops: cotton-loop coil leakage cost a full day (09-06→09-07); recurring loop/stenter pauses
OPT-0112026-09-18 P2 OPEN Design color-correction loop: 3+ rounds per design, chased till 11pm; files mostly unnamed
OPT-0122026-09-18 P2 OPEN Dispatch grey pickups age >1 week ("party garam"); no pickup-aging view

OPT-001/002/007 (data-hygiene, internal) are detailed here only; run report: data/insights/optimization/2026-09-19.md